翻訳と辞書
Words near each other
・ SRRM1
・ SRRM2
・ SRS
・ SRS "Dr. Vojislav Šešelj"
・ SRS (sailing)
・ SRS Cinemas
・ SRS Labs
・ SRS PU College
・ Srs travels
・ SRSD
・ SRSP
・ SRSP Flood Flow Canal
・ SRSS
・ SRT
・ SRT Communications
SRT Dark Red Line
・ SRT Light Red Line
・ SRT Red Lines
・ SRT1460
・ SRT1720
・ SRT2183
・ Srta
・ SRTM Water Body Data
・ SRTP
・ SRTV
・ SRU
・ Srubec
・ Srubna culture
・ Sruby
・ Srugim


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

SRT Dark Red Line : ウィキペディア英語版
SRT Dark Red Line

The Dark Red Line is part of the planned SRT Red Line suburban railway system to serve the greater Bangkok Metropolitan Region which includes Bangkok Province and 4 adjoining provinces. It will run north–south from Thammasat University's Rangsit campus in Pathum Thani Province to Maha Chai in Samut Sakhon Province.
In February 2009, Prime Minister Abhisit Vejjajiva secured a 24 billion baht (US$685 million) loan from the Japanese Government for the 67 km (42 mi) segment. The first Phase from Bang Sue to Rangsit was approved in 2010 but delayed due to a complicated 2.5 year contractual dispute. However, Phase 1 finally started construction in 2013.
==Progress==
The 21.6 km, 6 station (2 to be built later) Rangsit to Bang Sue section finally started construction in May 2013 after new contracts were signed in January 2013. A construction period of 3 years was stated. Construction works were delayed by 2 months due to site access issues for the contractor and delays related to removing slum dwellers residing within the right of way. However, it was hoped that the use of some of the old Hopewell pillars would speed up the initial construction timetable.〔'Red Line deal inked; some Hopewell pillars to stay', MCOT, 31 January 2013〕 By the end of 2013, the project was only 3% done & already months behind schedule due to a longer timetable in removing the Hopewell Pillars.〔http://www.prachachat.net/news_detail.php?newsid=1388935951〕
In June 2014, the SRT requested an additional 8.14 billion baht to modify the Dark Red line to 4 tracks instead of 3, to accordingly redesign all stations and to provide for the longer platforms for the Bang Sue Terminal to cater for future HSR lines. 8.140 billion baht request is; 4.32 billion baht for Contract 1 (modifications to Bangsue Central to cater for High Speed trains); 3.35 billion Baht for Contract 2 (4th track and stations redesign) and 473 million baht for Contract 3.
It is worth noting that the budget for the 1st Phase of the Dark Red Line project have progressively increased due to numerous delays and further redesign of the project. From an initial 59.89 billion baht in 2007, to 75.55 billion baht in 2009 and to 80.38 billion baht in 2012. The additional requested 8.14 billion baht will increase the current budget to 88.52 billion baht.